Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2006 | PLUMBING - ROUGH, SOIL | Approved | OK TO CLEAR SERVICE OUTAGE TO INSTALL NEW SWITCH IN GEAR CONT. REQUEST AFTER HOURS PAID CH# 108.00 6347 CALLED INTO MAP ROOM FOR CLEARANCE 4:14PM |
|
| 01/04/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* BUILDING SECURE & HCS CONNECTION OK TO COVER |
|
| 12/27/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*PIPE WRAPS OK FOR CONCRETE | |
| 12/23/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/22/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* UNDERGROUND IN BUILDING - OK WATER TEST TO ABOVE FIXTURE SAN TEES - OK NEED TO SEE PIPE WRAPS BEFORE CONCRETE |
|
| 12/21/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* ABS DWV INSIDE BUILDING OK EXCEPT FOR 3" DOUBLE SANTEE AT BACK TO BACK CLOSETS. OK TO BACKFILL ALL BUT THAT SECTION RE WATER TEST WILL NEED TO SEE FOAM PIPE WRAPS 4" BUILDING SEWER HAS SOME AREAS WITH BACK PITCH - CORRECT SLOPE AND RECALL FOR INSPECTION |
|
| 12/20/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |