Inspection History Details
Inspection Status: Partial Approval
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM05829
Inspection Description - ENGINEERING - FINAL
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/25/2007 | ENGINEERING - FINAL | Partial Approval | 1) FINISH STRIPING FOR ADA ROUTE 2) REMOVE DUPSTER FROM PARKING LOT 3) REMOVE DIRT AND CONCRETE DEBRIS FROM DRIVEWAY AILES BILL POTTER ADVISED OF THE MINOR WORK THAT NEEDS TO BE COMPLETED PRIOR TO FINAL RELEASE. |
|
05/25/2007 | ENGINEERING - FINAL | Approved | ALL PREVIOUSLY NOTED ITEMS HAVE BEEN COMPLETED EXCEPT THE REMOVAL OF THE DUMPSTER. THIS HAS BEEN RELOCATED TO THE PARKING AREA ALONG THE WEST SIDE OF THE SITE AND WILL BE REMOVED NEXT WEEK. | |
04/17/2007 | ENGINEERING - FINAL | Partial Approval | T05BU01695 8210 S HOUGHTON IS GRADING PERMIT (IN FOR REVISIONS) -ALL ASPHALT IN PLACE -CURBING COMPLETE WITH EXCEPTION OF PLANTER AREAS -1 MISSING SIDEWALK (PART OF REVISIONS) -DUMPSTER AND PORTA-TOILETS STILL ON SITE TO BE MOVED BEHIND BUILDING -LANDSCAPE WORK ONGOING -ENSURE ALL TRADES LEAVE CLEAR AREA IN FRONT OF THE BUILDING |
|
02/23/2007 | ENGINEERING - FINAL | Not ready for Inspection | SITE WORK NOT COMPLETE GRADING PLAN CHANGES MUST BE REVIEWED AND APPROVED BY COT BEFORE C OF O |