Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/22/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ALL CLEANOUTS TO BE ACCESSIBLE 2. EXPANSION TANK TO BE SECURED 3. TERMINATE FLOOR CLEANOUT IN OLD X-RAY 4. ALL PUBLIC USE LAVS REQUIRE SOME FORM OTHER THAN THE WATER HEATER TO CONTROL HOT WATER TEMPERATURE NOT TO EXCEED 120 DEG. 5. SEE DETAIL PAGE P2 FOR WATER HEATER INSTALL |
|
| 02/16/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WATER TO BE ON TO FIXTURES 2. CLEANOUTS TO BE ACCESSIBLE. 3. NO WATER PIPING TO BE DIRECTLY EMBEDDED IN CONCRETE. 4. ACCESS TO ALL ROOMS 5. UNFINISHED ROOM NEEDS FLOOR CLEANOUT NOT COMPLETE LIST SHELL BUILDING NEEDS CALL IN FOR FINAL WITH APPROVAL FOR FINAL ON THIS PERMIT. |