Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2007 | ELECTRIC - CABLE DROP | Approved | IVRS - Inspection :* | |
| 04/05/2007 | ELECTRIC - CABLE DROP | Not ready for Inspection | IVRS - Inspection :* | |
| 04/04/2007 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO RUN & INSTALL GROUNDS PER NOTE1 ON SHEET E3.1 2. SIZE BONDING JUMPER ON SERVICE RISER PER NEC 250.102 3. IDENTIFY EQUIPMENT GROUNDING CONDUCTORS PER NEC 250.119 4. NEED SWITCHBOARD & PANEL DIRECTORIES PER NEC 408.4 5. COMPLETE INSPECTION ITEMS SHOWN FROM PREVIOUS INSPECTION. |
|
| 04/03/2007 | ELECTRIC - CABLE DROP | Not ready for Inspection | IVRS - Inspection :* 1. NEED TO POST BOND FOR TEMP POUR TO TEST 2. NEED LETTER OF TORQUE 3. RECALL WHEN ALL WORK COMPLETE |