Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM05737

Parcel: 107121650


Addresses:

208 W LAGUNA ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
11/29/2005 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
11/21/2005 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) INSTALL REBAR ONTO BOTTOM OF STHD8'S
2) BEND AND SECURE BOTTOM OF STHD8'S FARTHER INTO CONCRETE FOOTING TO AVOID EXCESSIVE SPALLING AT FUTURE FRAMING
3) PLACE REBAR TO MAINTAIN MINIMUM 3" CONCRETE
4) TO LARGE OF PIECES OF CONCRETE ENCASEMENT HOLDING REBAR MAXIMUM 3" X 3", CHANGE TO SMALLER PIECES OR SWITCH TO ALTERNATE METHOD
5) MAINTAIN MINIMUM 16" WIDTH CONCRETE FOOTING PER PLAN
6) STOPPED INSPECTION