Permit: T05CM05720

Parcel: 13316039A

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T05CM05720

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/29/2007 ENGINEERING - FINAL Approved
03/29/2007 ENGINEERING - FINAL Approved
03/28/2007 ENGINEERING - FINAL Cancelled
03/27/2007 ENGINEERING - FINAL Partial Approval NEEDS TO HAVE A LETTER THAT CLEARLY CERTIFYS THE PROJECT OR PROVIDE AN AS-BUILT SITE PLAN.
03/21/2007 ENGINEERING - FINAL Cancelled NOT READY, NEEDS CERTIFICATION LETTER
03/08/2007 ENGINEERING - FINAL Partial Approval OK FOR EXTENSION OF TEMPORARY C OF O.

PROVIDE AN ORIGINAL COPY OF THE CETIFICATION LETTER THAT IS STAMPED AND SEALED BY THE ENGINEER.

1. PROVIDE A LETTER OF CERTIFICATION FROM THE AZ REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT WAS CONSTRUCTEDTO THE C.O.T. APPROVED PLANS AND THAT THE DRAINAGE AND R/D BASIN WILL FUNCTION AS DESIGNED.

NOTE: THE ENGINEER MUST ADDRESS THE 16 CFS OFFSITE FLOW FROM THE MAVERICK ONTO THIS SITE. THE 6" CORB BLOCKS THIS FLOW.

2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.

JORDAN 481-4509
03/06/2007 ENGINEERING - FINAL Partial Approval OK FOR EXTENSION OF TEMPORARY C OF O.
1. PROVIDE A LETTER OF CERTIFICATION FROM THE AZ REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT WAS CONSTRUCTEDTO THE C.O.T. APPROVED PLANS AND THAT THE DRAINAGE AND R/D BASIN WILL FUNCTION AS DESIGNED.
NOTE: THE ENGINEER MUST ADDRESS THE 16 CFS OFFSITE FLOW FROM THE MAVERICK ONTO THIS SITE. THE 6" CORB BLOCKS THIS FLOW.
2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
02/22/2007 ENGINEERING - FINAL Partial Approval OK FOR EXTENSION OF TEMPORARY C OF O.
1. PROVIDE A LETTER OF CERTIFICATION FROM THE AZ REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT WAS CONSTRUCTEDTO THE C.O.T. APPROVED PLANS AND THAT THE DRAINAGE AND R/D BASIN WILL FUNCTION AS DESIGNED.
NOTE: THE ENGINEER MUST ADDRESS THE 16 CFS OFFSITE FLOW FROM THE MAVERICK ONTO THIS SITE. THE 6" CORB BLOCKS THIS FLOW.
2. CORRECT DRAINAGE AT THE NORTHWEST CORNER OF THE NEW BUILDING.
3. COMPLETET ALL PAVEMENT STRIPING.
4. PROVIDE ALL WHEEL STOPS.
5. PROVIDE ALL HANDICAP PARKING STRIPING, DECALS AND SIGNS.
6. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
01/02/2007 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O.
1. COMPLETE PAVEMENT STRIPING AND SIGNAGE.
2.CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
3 PROVIDE TRUNCATED DOMES AND H/C PARKING SIGNS.
4. PROVIDE AN ENGINEER'S LETTER OF CERTIFICATION THAT THE PROJECT WAS BUILT IN CONFORANCE WITH THE APPROVED PLANS.
12/14/2006 ENGINEERING - FINAL Not ready for Inspection COMPLETE ALL SITE WORK