Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05CM05720
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/01/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. NSF LISTING ACCEPTED 2. LETTER FROM OWNER DELETING SODA AND JUICE DISP. ACCEPTED. 3. NEED TO SUPPORT INDIRECT DRAIN FOR H.1 4. BACKFLOW CERTS RECEIVED |
|
| 02/22/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. RATIONAL EQUIP NEEDS UPC OR CSA LISTING FOR BACKFLOW CONDITIONS. 2. NEED IRRIGATION CERT 3. WILL COLLECT ALL BACKFLOW CERTS AT LATER INSP. 4. PROVIDE MIN 1" AG ON INDIRECT DRAINS 5. PVC INDIRECT DRAINS REQUIRE PRIMER & SUPPORT |
|
| 02/15/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PROVIDE LISTING FOR BACKFLOW PROTECTION FOR RATIONAL COMB OVEN OR INSTALL BACKFLOW PROTECTION . PROVIDE BACKFLOW CERTS FOR ALL INTERNAL ASSEMBLIES INCLUDING IRRIGATION ALL EQUIPMENT SHALL BE INSTALLED FOR FINAL. |
|
| 01/02/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* NO PROBLEM W/TEMP C OF O FROM PLUMBING INSPECTOR IN ALL AREAS EXCEPT KIT |
|
| 12/26/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* OK TO COVER WALLS IN KIT. |
|
| 12/22/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* AS OF DEC. 20 - 06 THERE IS GALV PIPING UPSTREAM OF IRRIGATION BACKFLOW ASSEMBLY. CERTIFICATION SHALL BE DATED AFTER CORRECTING INSTALLATION. PIPING INSULATION SHALL BE SEALED W/ADHESIVE PER SPEC#25 AND MANUFACTURES INSTALLATION REQUIREMENTS. PROVIDE LETTER FROM ENGINEER FOR PIPE CHANGE AT ICE MAKER DOES P-9 CONNECT TO 3/4 OR 1/2"? |
|
| 12/20/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* INTERMEDIATE INSPECTION OF REVISED KIT AREA WATER PIPING NOT PER PLAN 140 DEG. NOT SHOWN TO OVER 3/4" PIPE SPECIFIED TO EQUIPT. AT OVEN, DISHWASHER AND ICE MAKER OK TO INSULATE AFTER CORRECTING DWV OK |
|
| 11/16/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* - REGULATE MIXING VALVE TO DELIVER NO MORE THAN 120 DEGREES. - EVERYTHING ELSE EXCEPT KIT AND IRRIGATION SUPPLY IS OK. - CALL FOR 03040 INSP. WHEN BACKFLOW PREVENTION DEVICE HAS BEEN INSTALLED AND CERTIFIED. - USE NON-FERROUS PIPING UPSTREAM OF ASSEMBLY. |
|
| 11/13/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* SEE NOTES FROM 10/25 1. PROPER USE OF FITTING REQUIRED AT CLEAN OUT PLUGS. 2. PUBLIC USE LAVS REQUIRE TEMPERED WATER 3. IRRIGATION BACKFLOW DEVICE NOT YET INSTALLED, NOTE: IRRIGATION PIPING HAS NOT BEEN INSTALLED 4. CLEAN OUT MISSING AT BREAKROOM SINK. 5. TRAFFIC RATED C.O COVER NEEDED AT SEWER 6. INSTALL WC CHINA BOWL CAPS. 7. INSTALL HB VAC BREAKERS ROOF OK KIT. AREA NOT COMPLETE WATER HEATER AND SAFETY DEVICES OK TOILET ROOMS OPERABLE I SEE NOT PROBLEMS THAT WOULD PREVENT TCO OTHER THAN HB VAC BREAKERS AND LAV TEMPERING VALVES. |
|
| 10/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - USE FACTORY TAPPED CLEANOUT PLUGS IF USING PLUG TO SECURE COVER. - TEMPERATURE LIMITING DEVICES REQUIRED AT PUBLIC USE LAVS. - ROUGH PLUMBING IN REVISED KIT AREA OK TO COVER PROTECT PIPING PASSING THRU CONCRETE. |