Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM05720
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* PIPE WRAPS & TRAP PRIMER OK 2" T/K H2O RISER AT EAST SIDE 50 PSI TST 1' OUT 3' ABOVE FLOOR. |
|
| 03/20/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* COPPER PIPING UNDER BUILDING SCAB SHALL BE SILVER SOLDER FOR FITTING WITH TEST. |
|
| 03/15/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CORRECTION MADE TO VENT AT FLOOR DRAIN WATER TEST THRU BUILDING TO 3' OF EXTERIOR. |
|
| 03/13/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL PLUMBING ROUGH WITH CORRECT FALL AND HAVE FIXTURES ROUGH INS PROPERLY FOR INSPECTIONS. |
|
| 03/12/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |