Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM05640

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
03/31/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
03/30/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. BACKFLOW CERTIFICATION ON SITE
2. MAKE ALL CLEANOUTS ACCESSIBLE. REMOVE TEST PLUGS USE COUNTER SINK, TAPPED, PLUGS (LEAVE OPEN)
3. INSTALL CHECK VALVE ON RE-CIRC LINE
03/27/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL.
NOTE: THIS OFFICE DOES NOT SUPPLY A PUNCH LIST FOR THE PLUMBER.
2. ABOVE CEILING COVERED WITHOUT INSPECTION.
3. WHEN THE INSPECTOR WROTE:"HANGERS AT EACH CHANGE OF DIRECTION OR ELEVATION" - THAT MEANT EACH SIDE.
4. HOT NOT INSULATED AS DIRECED ON 2/28/06