Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/31/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 03/30/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" BUILDING SEWER, 4" CLEAN OUTS OK TO COVER WAITING FOR PLAN REVISION OF 3" BUILDING DRAIN TO APPEAR ROUGH SOIL INSPECTION |
|
| 02/09/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 3" ABS DRAIN FROM TOILET RM & LOUNGE THROUGH EXTERIOR CLEAN OUTS W/WATER TEST ON ONE RISER OK PEX WATER PIPING LOOPED UNDER SLAB TO LOUNGE OK PLAN MUST BE REVISED TO SHOW ACCURATE PIPE SIZING AND REFLECT CHANGE OF WATER PIPING PLAN REVISION WILL BE REQUIRED FOR FINAL APPROVAL. |
|
| 02/08/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 3" ABS BUILDING DRAIN IS IN VIOLATION OF UPC SEC 708 THERE ARE AT LEAST 4 PLACES W/LESS THAN 1/4' PER FOOT SLOPE & CORRECTIONS REQUIRED FROM THE PREVIOUS TWO INSPECTIONS HAVE NOT BEEN COMPLETED. A REINSPECTION FEE IS BEING ASSESSED FEE MUST BE PAID WITHIN 5 DAYS OR NO FURTHER INSPECTIONS WILL BE PERFORMED. |
|
| 02/06/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*CORRECTIONS FROM PREVIOUS INSPECTION HAVE NOT BEEN MADE 3" DRAIN PIPING REQUIRES A MIN OF 2 % FALL THERE APPEARS TO BE ADEQUATE FALL AVAILABLE. THE UPPER TERMINAL COULD BE RAISED IF NECESSARY THE PLAN CLEARLY SHOWS A 4" BUILDING DRAIN, IF THIS IS GOING TO BE REVISED. RED LINE. PRINT TO COINSIDE WITH INSTALLATION CALL FOR INSPECTION AFTER CORRECTIONS HAVE BEEN MADE. CARLOS INFORMED ME THAT HE IS GOING TO SUE THE CITY |
|
| 02/02/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL PER PLAN OR REVISE PLAN SEE P101 4" SANITARY 2. PROVIDE 2% FALL IN ALL AREAS |