Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* SHOWER PAN OK |
|
| 05/30/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 05/30/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CORRECTIONS MADE OK OK TO COVER ALL AREAS TUBS OK FLANGES OK WILL NEED TO SEE SHOWER LINER ON 2ND FLOOR |
|
| 05/21/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. FIRST FLOOR CLOSET FLANGES TO BE SCREWED TO THE FLOOR. 2. SEE NOTE #1 FROM 5/15/07 3. NO MATERIAL SPEC'S SHOWN ON PLAN PROVIDE BLDG SPEC'S 4. HORIZONAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. |
|
| 05/17/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* COMPLETE LIST FROM 5/15/07 |
|
| 05/15/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. ABS SHALL BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS. 2. CLOSET FLANGES SHALL BE SECURED TO THE FLOOR BY APPROVED METHODS. |