Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. USE LAGGING ADHESIVE AND TAPE ON INSULATION MITRE THE FITTINGS. 2. ALL HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 3. CONTRACTOR TO PAY REINSPECTION FEE |
|
| 05/30/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* OK TO COVER ALL AREAS CORRECTIONS MADE OK |
|
| 05/21/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* PROVIDE APPROVED PLANS CHECK PIPE SUPPORTS REVIEW LIST FROM 5/17/07 COMPLETE ALL CORRECTIONS OR YOU MAY BE CHARGED A REINSPECTION FEE. |
|
| 05/17/2007 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. POST ADDRESS 2. PROVIDE APPROVED PLANS 3. PROVIDE WATER TEST 4. PROVIDE APPROVED PIPE SUPPORTS 5. PROVIDE STEP LADDER FOR INSPECTION 6. PROVIDE TEST TO FLOOD LEVEL ON TUBS 7. PROVIDE PROPER SLOPE ON ALL WASTE PIPING 8. PROVIDE WYE PATTERN FITTINGS ON HORIZ X HORIZ CHANGES OF DIRECTION. 9. PROVIDE 18" OF METALLIC PIPING AT FUTURE SWEAT CONNECTION BEFORE TRANSITION TO PEX. 10. INSTALL CLOSET FLANGES AT CORRECT HEIGHT AND SECURE. 11. SECURE VENTS MID-STORY, SECURE SHOWER VALVES. 12. 2" HORIZONTAL DRAIN REQUIRED AT TUB 13. WH DRAIN PAN DRAIN 14. LIST NOT COMPLETE |
|
| 05/17/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* COMPLETE LIST FROM 5/15/07 |