Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/26/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COVERED WITHOUT INSPECTION/HAS ELECTRIC WORK WITHIN 2) FRONT ENTRANCE RAMP MUST BE FLUSH (NO LEDGES AT BOTTOM OF RAMP) 3) ALL ACCESSIBLE ENTRANCES AND EXISTS MUST USE LEVER HARDWARE AND DEAD BOLTS THAT REQUIRE NO PINCHING, TWISTING OR TIGHT GRASPING 4) THRESH HOLDS AT ACCESSIBLE EXITS MUST COMPLY WITH ANSI 117.1 5) ACCESSIBLE BATHROOM REQUIRES: TOILET 16"-18" FROM SIDEWALL, CLARIFICATION OF WHETHER THIS IS ROLL-IN OR TRANSFER SHOWER, GRAB BARS IN SHOWER TO BE 33'-36" ABOVE FLOOR, SHOWER CONTROLS TO BE 38"-48" A.F.F., PULL HANDLE REQUIRED ON POCKET DOOR AND HALL TO SIDE APPROACH ADA RESTROOM SHOULD BE 42" NOT 36" |