Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2017 | BUILDING - FINAL | Approved | ||
| 06/14/2017 | BUILDING - FINAL | Not ready for Inspection | no access | |
| 04/18/2017 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/04/2017 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 w/heater requires catagory 3 vent pipe. * |
|
| 03/29/2017 | BUILDING - FINAL | Denied | 1- SHALL PROVIDE A 90 DEGREE COPPER ELBOW FITTING AT THE END OF THE T & P DRAIN 2- SHALL SEAL THE T & P DRAIN PENETRATION THRU THE EXTERIOR WALL. |
|
| 10/10/2016 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* Provide cut sheet on w/heater, does w/heater require t + p valve, provide combustion air for w/heater, lights in closet and shower require covers, 4" rigid dryer duct required in walls, provide ladder for roof access of unit ( HVAC ) |