Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM05367
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* REVISED APPROVED PLAN SITE APPROVED |
|
02/07/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
01/09/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PIPE WRAPS AND TRAP PRIMER OK 2) WATER TEST FOR ADDITION OF VENTS TO (2) FLOOR DRAINS AND ADDITION OF 2" DRAINAGE FOR 3-COMPARTMENT SINK DIRECT CONNECTION TO GREASE WASTE 4" DRAINAGE PER RED LINE DRAWIGN ON SITE TO BE REVISED AND CITY APPROVED 3) NEED TO VIEW INSTALL OF GREASE INTERCEPTOR WITH INLET AND OUTLET CONNECTION AND BUILDING SEWER TO POINT OF CONNECTION WITH HCS |
|
01/06/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*WATER TEST UNDERGROUND 4" GRASE WASTE & INTERIOR COMBO WASTE & VENT & SANITARY DRAINAGE TO 10' OUTSIDE BUILDING IS OK, EXCEPT 1) PLAN IS APPROVED IN ERROR REQUIRED REVISED CITY APPROVED PLANS. 2) FLOOR DRAINS AT MOP SINK AREA TO BE INSTALLED PER RED LINE DRAWINGS 3) INTERCEPTOR TO BE INSTALLED WITH VENT. 4) 3-COMP SINK WASH & RINSE TO GO TO DIRECT DRAINAGE ON GREASE WASTE PIPING |
|
01/05/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
01/04/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*( NO COMMENT WRITTEN ON PAPERWORK- JK) |
|
12/29/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* A STAMPED, SIGNED LETTER FROM ARCHITECT WILL BE REQUIRED FOR USE OF ABS. SWEEPS ARE REQUIRED FOR VERTICAL TO HORIZONTAL CHANGE OF DIRECTIONS. SEC. 910.3 REQUIRES THAT ANY BRANCH MORE THAN 15' IN LENGTH SHALL BE SEPARATELY VENTED 910.3 ALSO REQUIRES THAT THE MINIMUM AREA OF EVERY VENT INSTALLED IN A COMBINATION WASTE & VENT SYSTEM SHALL BE AT LEAST 1/2 OF THE CROSS SECTIONAL AREA OF THE DRAIN SERVED. SEC 910.6 - AN ACCESSIBLE CLEANOUT SHALL BE INSTALLED IN EACH VENT. SEC 910.5 - NO VERTICAL WASTE PIPE SHALL BE USED IN ANY SUCH SYSTEM SEC 905.2 - REQUIRES THAT EACH VENT SHALL HAVE ITS TAKEN OFF ABOVE THE DRAINAGE CENTER LINE. PROVIDE MIN 1% SLOPE ON 4" DWV PER PLAN FLOOR DRAIN IN RESTROOMS REQUIRE VENTING. |
|
12/27/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*PROVIDE SPECS TO USE ABS DWV PROVIDE MISSION COUPLINGS AT TRANSITION TO CAST IRON PROVIDE 4" CLEAN OUTS WHERE REQUIRED PER PLAN PROPER DRAINAGE FITTINGS REQUIRED COMBINATION WASTE & VENT TO COMPLY WITH SEC. 910. UPC |