Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05CM05361
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2006 | ELECTRIC - FINAL | Approved | 1) NOTE: TRIM RECEPTACLES IN EAST WALL IN MED ROOM AND BOND TRANSFORMER GROUNDING ELECTRODE CONDUCTOR DIRECTLY TO BLDG STEEL | |
| 06/23/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/21/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* COMPLETE ALL CORRECTIONS BEFORE INSPECTION. |
|
| 04/28/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* OK TO OCCUPY FOR THE PURPOSE OF SETTING UP OFFICES. 1. HEATER/RTU CKT IS UNDERSIZED NEC 220 2. NEED BUSHING #4 AND LARGER WIRE - NEC 300 3. NEED K.O PLUG ON GEAR. 4. VERIFY THAT BUILDING STEEL IS GROUNDED NEC 250.30 (4) 5. RACEWAY FOR G.E.C NEEDS TO BE ELECTRICALLY CONTINUOUS - NEC 250.64 6. USE PROPER LUG/CONNECTIONS FOR GROUNDS IN TRANSFORMER - NEC 110 |
|
| 04/28/2006 | ELECTRIC - FINAL | Partial Approval | OK FOR TEMP C OF O FOR SETTING UP OFFICES | |
| 04/26/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |