Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2006 | ENGINEERING - FINAL | Approved | ||
| 06/29/2006 | ENGINEERING - FINAL | Denied | 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. PROVIDE CERTIFIED LETTER FROM THE ARIZONA REGISTERED P.E. THAT CERTIFYS THAT THIS PROJECT IS CONSTRUCTED IN CONFORMANCE WITH THE APPROVED PLANS, SPECTS AND GEOTECHNICAL REPORT RECOMMENDATIONS. 3. COMPLETE GROUND COVER STABILIZATION AROUND BUILDING. CERTIFICATION LETTER MUST BE PREPARED BEFORE A C OF O CAN BE ISSUED. |