Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2006 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 05/02/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STUCCO WEEP SCREED CANNOT BE BURRIED IN CONCRETE 2) SEWER TRACER MUST EXTEND TO GRADE 3) CIRCUIT BREAKERS MUST BE RATED AT 22000 AMP SHORT OR EQUAL TO TRANSFORMER. PROVIDE TEP CERTIFICATION OF TRANSFORMER 10000 AMP SHORT CIRCUIT OR UPGRADE CIRCUIT BREAKERS 4) PROVIDE PHYSICAL PROOF OF INSULATION 5) NEED EPOXY BOLT CERT |