Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2006 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 05/16/2006 | BUILDING - FINAL | Denied | 1) BEDROOM S/E HALF HOT NOT WORKING 2) NO POST TENSION TAG OUTSIDE 3) OUTLET IN BEDROOM 2 SOUTH WALL NOT WORKING |
|
| 05/03/2006 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) HOUSE NOT READY FOR FINAL INSPECTIONS 2) HOLDOWN AND SHEARWALL REPAIR OK TO COVER |
|
| 04/30/2006 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* OK TO COVER HOLDDOWNS IN GARAGE WALL. |
|
| 04/24/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) FINAL INSPECTION NOT READY AND NOT MADE 2) THIS INSPECTION IS FOR HOLDOWN ANCHOR REPLACEMENT ONLY 3) WIRE TRAPPED BY ADDITIONAL STUD 4) SHEARWALL OSB SEAM CANNOT BREAK BETWEEN STUDS. EDGE NAILING MUST BE ON SAME STUDS FOR SEPERATE OSB PANELS |