06/28/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
05/08/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. YOU HAVE PIPING SUPPORTED BY OTHER PIPING. ALTHOUGH THIS IS NOT AN ACCEPTABLE PRACTICE I MAY ALLOW THIS IN SOME AREAS BUT, PROVIDE SEPARATE SUPPORTS FOR THE 2" MAIN WATER LINE, 1/2 COLD BRANCH LINE RESTING ON CEILING GRID, 3/4 HW BRANCH AND THE GAS LINE TO WATER HEATER. 2. THE REVISED PLANS ON SITE ARE NOT APPROVED. 3. THE REVISED PLAN DOES NOT APPEAR TO ADDRESS THE FIXTURES NOT INSTALLED PER YOUR ORIGINAL PLAN. 4. THE REVISED GAS DRAWING DOES NOT INCLUDE THE GAS BRANCH LINE RUNNING EAST-WEST IN THE SOUTHERN HALF OF BUILDING. |
|
04/28/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE NOTES FROM PREVIOUS INSPECTIONS. OVERHEAD VENT ABOVE DF, HAND SINK AND LAVITORS REQUIRE SUPPORT AT EACH END. WATER PIPING NEED SUPPORT EVERY 6' AND GAS PIPING TO WH NEEDS SUPPORT. PLAN SHOWS TWO SINKS P-6 THAT WERE NOT INSTALLED, PLEASE REVISE TO SHOW DELETION OF P-6 SINKS. GAS PIPING HAS BEEN MODIFIED, PLEASE PROVIDE A PIPING DRAWING. SEC OF GAS SYSTEM. |
|
01/30/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REVISE PLAN TO SHOW WORK DONE, DELETE PLUMBING THAT WAS NOT DONE 2. SHOW CHANGES MADE ON GAS SYSTEM. SHOW ADDED FIXTURES. DF & SINK 3. PROVIDE PRESSURE TEST USING A GAUGE WITH 1/10 PSI INCREMENTATION 4. PROVIDE ACCESS TO ABOVE CEILING PIPING FOR INSPECTION. 5. PROVIDE HEAT TRAP NIPPLES ON WH TO MEET ENERGY CONSERVATION REQUIREMENTS 6. CORRECT DRIP AT WH - CORRECT COPPER PIPING TOUCHING FLUE. SEE PREVIOUS NOTES. 7. CAULK UNDERSIDE OF URINAL. |
|
01/17/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* WATER HEATER VENT WATER HEATER T & P AIR GAP CLEAN OUT AT MOP SINK CALL FOR INTERMEDIATE INSPECTION FOR ABOVE CEILING COPPER UNDER 2" SHALL BE SUPPORTED AT 6' MAX NO HUB VENTS SHALL BE SUPPORTED WITHIN 18" OF EACH JOINT. PROVIDE TEST ON GAS SYSTEM - PROVIDE REVISED PRINT |