Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* APPROVED PER APPROVED PLANS |
|
| 10/05/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE LIST FROM 9/28/06 SUPPORT FOR DRAIN PIPING TO FLOOR DRAIN |
|
| 10/03/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE LIST FROM 9/28/06 LIST IS NOT COMPLETE |
|
| 09/28/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - CALL FOR ABOVE CEILING INSPECTION - PROVIDE BACKFLOW CERTS - BACKFLOW PREVENTION DEVICES REQUIRED FOR NON-CARBONATED BEVERAGES. - TERMINATE VENT ON EXTERIOR WALL. - SUPPORT RP DRAIN AT CARBONATORS - SECURE EXPANSION TANK, SECURE MOP SINK FAUCET - PROVIDE 1 1/4" PIPING AT HW TO FIRST TEE. - PROVIDE ACCESS TO ROOF - ALL PLASTIC VENTS TO BE PROTECTED FROM UV RAYS - CLEANOUT PLUGS SHALL HAVE A FACTORY TAP TO RECEIVE MACHINE SCREW. - SEDIMENT TRAPS REQUIRED AT GAS EQUIPMENT. - TRAP AND TRAP ARM SHALL BE THE SAME SIZE, TRAP ARM CANNOT INCREASE IN SIZE. - INDIRECT WASTE PIPING REQUIRES CLEANOUTS AT CHANGE OF DIRECTIONS. - ICE MAKER CONDENSATE SHALL DRAIN SEPARATE FROM ICE BIN. - AIR ADMITTANCE VALVE REQUIRES A LUVERED ACCESS TO ALLOW FREE FLOW OF AIR. - AIR GAPS REQUIRED FOR INDIRECT DRAINS. LIST MAY NOT BE COMPLETE. |