Permit: T05CM05189

Parcel: 13824164B

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
09/14/2006 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
09/13/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
LEAKS ON GAS PIPING
08/31/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1. INSTALL GAS PIPING PER PLANS
2. INSTALL GAS COCKS
08/28/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
NO ONE ON SITE DOOR LOCKED
UNABLE TO DO INSPECTION
08/02/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
06/16/2006 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
OK TO COVER PART OF WALL NORTHEAST SIDE THAT AS GAS PIPE IN WALL PSI TEST IN THAT WALL OK
04/10/2006 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
04/04/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
PROVIDE SAFETY PLATES
COPPER TOUCHING METAL, ISOLATE AND SECURE COPPER
REMOVE EXCESS FLUX FROM SOLDER JOINTS W/MOIST TOWEL SEE INSTALLATION STANDARDS.
ICE MAKING EQUIPMENT REQUIRES BACKFLOW PROTECTION
INSTALL IN ACCESSIBLE AREAS
SUPPORT ABS AT CHANGE OF DIRECTIONS AND AT EVERY 4'
CLOSET FLANGE SHALL BE SECURED TO FLOOR W/BRASS SCREWS.