Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05CM05168
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* RECEIVED LETTER OF TORQUE FOR SWITCH GEAR |
|
01/15/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. HAVE ELECTRICAL CONTRACTOR ON SITE TO OPEN PANELS AND SWITCH GEAR 2. VENDING MACHINE LISTED FOR INDOOR USE ONLY 3. RECALL WHEN READY |
|
01/04/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE LETTER OF TORQUE FOR TERMINATIONS IN SWITCH GEAR 2) BOND GAS AND WATER AFTER SWING OVER COMPLETE 3) RECALL AFTER SWING OVER COMPLETE AND GENERATOR REMOVED 4) HAVE ENGINEER PROVIDE LETTER FOR CHANGE IN SERVICE ENTRANCE CONDUCTOR SIZES |
|
12/19/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CONNECT GROUNDING CONDUCTORS TO LIGHT POLES 2. CANNOT RUN LOW VOLTAGE WIRING WITH HIGH VOLTAGE NEED TO BE IN SEPARATE RACEWAY 3. USE PROPER FITTINGS FOR CONNECTION TO PVC |
|
12/12/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. WIRE SLUSHIE MACHINE 2. NEED PANEL DIRECTORIES 3. NEED TO INSTALL POLE LIGHTS 4. INSTALL LUGS FOR GROUNDING ROOFTOP JUNCTION BOXES 5. DISCONNECT FOR HW RECIRC. 6. OK OUTDOOR LIGHTING ON BUILDING & IN CANOPY 7. INSTALL LOCKOUT MEANS FOR INTERIOR SIGNS |
|
12/11/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. OK POLE BASES 2. OK SEAL OFFS. FUEL ELECTRIC OK. 3. RECEIVED LETTER FOR ESTOP SYSTEM 4. EM LIGHTING NOT PER PLAN. EM LIGHTS BACK OF STORE NOT WORKING 5. CANNOT USE SHEETMETAL SCREWS FOR GROUNDING 6. INSTALL BONDING SCREW IN DISCONNECTS 7. GROUND SAT DISHES 8. INSTALL SEALED COVERS AND RECEPT IN FRONT RAISED FLOOR 9. INSTALL ALL SCREWS IN INDUSTRIAL COVERS 10. NEED PANEL SCHEDULES 11. WIRE ROOFTOP UNIT 12. WIRES COMING OUT OF SIDE OF LIGHT BACK OF STORE 13. INSTALL ALL EQUIPMENT 14. SEE LAST PAGE FOR SIGN LIGHTING ISSUES INTERIOR SIGNS: 1. GTO NOT ALLOWED IN WALL CAVITY 2. TIGHTEN LOOSE FITTINGS 3. BOND FLEX RACEWAYS (600.7) 4. SWITCHES TO BE CAPABLE OF BEING LOCKED OUT (600.6) 5. MARKING LABELS AS PER 600.4 6. GTO & BOOT - VERIFY FROM MANUFACTURE FOR PAINT |
|
12/10/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. OK PACKING IN SEAL OFFS 2. ELECTRICAL CONTRACTOR TO GO THROUGH ENTIRE JOB AND CHECK ALL WORK 3. OK 2 POLE BASES NORTH ENTRY, 1 BASE WEST ENTRY 1 BASE BY TRASH AREA |