Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (12) IN HOUSE BACKFLOW CERTIFICATIONS |
|
| 10/26/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/17/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE FULL SIZE WATER PIPING TO BACKFLOW ASSEMBLIES RIDGID PIPED, IT SHALL NOT ROUTE THRU ELECTRIC PANEL DEDICATED SPACE. 2. PROVIDE SEPARATE FULL SIZE INDIRECT DRAINS FOR ICE MAKING MACHINES & CONDENSOR SECTIONS OF ICE MAKING MACHINES. 3. PROVIDE CORRECT DIRECT CONNECTION WITH FULL SIZE SEPARATE INDIRECT DRAINAGE FOR THIRST FREEZER MACHINES, SODA DISPENSERS. 4. SHALL PROVIDE RUN TEST AT TIME OF INSPECTION NOTE: YOUR WATER HEATER DOES NOT HAVE A TEMPERATURE & PRESSURE RELIEF DRAIN. THIS IS A SAFETY HAZARD. 5. BACKFLOW CERTIFICATIONS ON SITE. |
|
| 10/03/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LIST FROM 1/13/06 COMPLETE 2. PROVIDE PLANS SHOWING ENTIRE SCOPE OF WORK 3. HAVE PLUMBER ON SITE. |
|
| 01/13/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |