Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - YARD WTR LINE/TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2006 | PLUMBING - YARD WTR LINE/TEST | Approved | IVRS - Inspection :* 1) CONTRACTOR RESPONSIBLE TO ENSURE PROPER BACKFILL MATERIALS AND METHODS ARE FOLLOWED |
|
| 02/06/2006 | PLUMBING - YARD WTR LINE/TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 02/02/2006 | PLUMBING - YARD WTR LINE/TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE PROTECTION OF TUBING PER VANGUARD INSTALLATION STANDARDS AND COT DIRECTIVE. 2. INSTALL COPPER TUBE IN ACCORDANCE WITH UPC SECTIONS 310.3 - 316.1.2.3 - 606.0.0 - 316.1.2.9 3. CORRECT LEAK AT PRV |
|
| 12/09/2005 | PLUMBING - YARD WTR LINE/TEST | Partial Approval | IVRS - Inspection :* 60 PSI AIR TEST FROM METER LOCATION UP TO BUILDING - OK 1. NEED TO VIEW CONNECTION TO MOTOR & BUILDING, PLEASE TAKE CARE TO AVOID ANY IMPROPER MATERIAL AROUND YARD WATER PIPING AT BACKFILL. |