Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2005 | PLUMBING - FINAL | Approved | ||
| 11/18/2005 | PLUMBING - FINAL | Partial Approval | PARTIAL APPROVAL NO PROBLEM FOR TEMP C/0 | |
| 11/17/2005 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* | |
| 11/16/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CHECK VALVE AT IMMEDIATE DISCHARGE OF PUMP ON FOOT SPA PER PLAN 2) PROVIDE RIDGID PIPING FOR THIS DRAIN TO APPROVED ELEVATED FLOOR SINK AND SECURE PROPERLY 3) TERMINATE BACKFLOW DEVICE DRAINS INTO THIS FLOOR SINK 4) WATER HEATER TEMPERATURE AND PRESSSURE RELIEF DRAIN TO TERMINATE AT 90 DEGREE DOWN 6" TO 24" FROM FINISH ELEVATION |
|
| 11/15/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*18" MINIMUM REQUIRED FOR STANDPIPE DRAIN ( FROM TRAP SEAL TO TOP OF STANDPIPE) R.P.G DRAINS MUST DRAIN INTO SAME STANDPIPE NOT INTO SIDE FITTING BRANCH TAIL PIECE UNDER SINK IS NOT LISTED FOR HORIZONTAL POSITION. |
|
| 11/14/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*NOT READY PLEASE CALL IN ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL |