Permit: T05CM05116

Parcel: 11446019D

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
11/14/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
09/12/2006 PLUMBING - INTERMEDIATE Denied SAFETY PLATES MISSING AT P3, P1H, P2H AND 4" CLEAN OUT. RECALL WHEN READY FOR INSPECTION.
OVERHEAD COPPER NOT PROPERLY SUPPORTED AT EVER 6' AND AT EACH BRANCH CONNECTION AND EVERY ELEVATION CHANGE. ALSO ISOLATE FROM METAL.
09/12/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
- K TO COVER WALLS
- CLOSET FLANGES AND OVERHEAD SUPPORTS LEFT TO COMPLETE.
09/08/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
ABS UNDER SLAB OK PER CLAYTON ENGINEERING
OK TO INSULATE HW PIPING PER SPEC AFTER REMOVING EXCESS FLUX W/A DAMP RAG.
INSTALL MISSING SAFETY PLATES
RECALL FOR 3035 INSPECTION AFTER COMPLETING.
09/07/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
- ROUGH SOIL NOT YET APPROVED
- PROVIDE DOCUMENTATION REQUESTED ON 6/29
- CLEANOUTS REQUIRING EXTENSIONS SHALL BE MADE W/WYE PATTERN FITTINGS.
- CHANGES OF DIRECTION TO BE SWEEPS
- COPPER NOT INSTALLED PER PLAN AT WC AND WH
- SAFETY PLATES NEEDED