Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM05115
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2008 | PLUMBING - ROUGH, SOIL | Approved | REFERENCE T06CM01872 FOR BULK OF INSPECTIONS ON THIS HOSPITAL ADDITION. | |
10/26/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/14/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED PLAN REVISION FOR ROUGH SOIL CHANGES TO FINAL PERMIT |
|
03/14/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* SECTION A WEST OF TUNNEL PRE-SLAB INSP. OK CITY APPROVED REVISIONS NEEDED FOR FINAL |
|
11/17/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* SEC B COMPLETE TIE-INS TO EXISTING AND CITY APPROVAL OF REVISIONS ARE ALL THAT REMAIN. |
|
11/15/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* UNDERGROUND PIPING BETWEEN R-4 AND X AND BETWEEN COL. 1 AND 10 OK TO COVER |
|
11/14/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* UNDER SLAB BRANCH PIPING BETWEEN COLS. 10 AND 2 AND BETWEEN R.4 AND X, OK TO COVER. |
|
11/13/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* ROUGH PLUMBING BETWEEN COL. 10 AND 15 AND COL. R.4 AND X OK TO COVER |
|
11/09/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* BRANCH LINES ALONG COL. 14 AND AREAS T-14, T-13 AND R-4, 14 THRU R-4 13 |
|
11/07/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CONTINUATION OF 4" BUILDING DRAINAGE WEST FROM COLUMN 10 AND NORTH TO S + 1.5 PER REVISED PLAN #5 DATED 10/12/06 P2.1B SERVING AS RED LINE WATER TEST OK |
|
11/06/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CONTINUATION OF 6" SANITARY FROM R.4 SOUTH THEN WEST WITH 4" RISERS TO BE CONTINUED TO COLUMN LINE 10. 4" SANITARY AT WEST FACE OF EXISTING BLD BETWEEN B & C THRU EXISTING SOUTH WALL TO BASEMENT PER P2.1A SERVING AS REDLINE. |
|
11/02/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) CONTINUATION OF 4" BLDG DRAINAGE INCLUDING 2" RISER AT ELEVATOR PIT FOR REVISION 5 DATED 10/12/06 INITALLED AND HIGHLIGHTED IN PLUMBING TRAILER |
|
10/23/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
10/21/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* AFTER HRS. INSP. PAID WITH SUNDT CHK.#00001275 ALL UNDERGROUND PIPING WITHIN COL 3.8 THROUGH COL. 15 AND FROM COL K TO R-4 IS COMPLETE. OK TO COVER |
|
10/20/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
10/19/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* TO ARRANGE FOR AN AFTER HRS. INSP. CALL JASON 909-5147 DURING REGULAR HOURS. SPECIAL INSPECTIONS ARE $108 TO CITY OF TUCSON. COL 13 BETWEEN J.9 AND M. BRANCH LINES TEST OK TO COVER. USE 3005 FOR ROUGH INSP. |
|
10/18/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
10/17/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* - SEC. B SANITARY ALONG COL. K.5 FROM COL.5 - COL.15 AND ALONG COL.14 FROM MAIN TO R LINE, AND COL. 8 FROM MAIN TO R LINE -- MAIN ONLY OK TO COVER. |
|
10/13/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* K THRU 5A AND 1.7 THRU 9.5 ALONG GRID 5A |
|
10/09/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* UNDERGROUND PLUMBING LOCATED WITHIN COLS. A-D.6 AND 3.9 - 14.6 OK TO COVER PROVIDE PIPE WRAP PROTECTION & TRAP PRIMERS FOR PRESLAB. |