Permit: T05CM05115

Parcel: 133170630


Addresses:

350 N WILMOT RD


Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Permit Number - T05CM05115

Inspection Description - BUILDING PRE-SLAB

Inspection Status - Approved

Date Description Inspector Results Comments
10/26/2007 BUILDING PRE-SLAB Approved IVRS - Inspection :*
05/03/2007 BUILDING PRE-SLAB Cancelled
03/14/2007 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
FIRST FLOOR L.8-E.N/1.0-2.0 SHEET S2.1B; OK
OK REINFORCING STEEL REPORT
02/20/2007 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
NOTE: EQUIPMENT PAD ON SECOND FLOOR OK TO POUR
1. GRIDLINE FOR THIRD FLOOR K-P/1.2-15 SHEET S2.EP
2. SUPER STRUCTURE OK AREA B.1 REGARDING TO AREA K-P/1.2-15 WELD, HIGH 5-BOLTS REPORTS PROVIDED.
02/09/2007 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1. 2ND FLOOR AREA PART B-1" P.8-N/14-15
N-2.9/4-15, 4-1.5/N-L, N.8-N.1/4-1
2. SUPER STRUCTURE OK AREA B-1
PROVIDED WELD, H-S-B STEEL REPORTS
01/24/2007 BUILDING PRE-SLAB Denied IVRS - Inspection :
See detailed listing on site.| 999*
01/18/2007 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
ACTIVITY NO. T06CM01872
REBUILT FOR PARTIAL ON THIS ACTIVITY

1. 3RD FLOOR AREA "OK" B/F - 2/13.8 OK TO PLACE SLAB
2. SUPER STRUCTURE OK AREA "A"
11/29/2006 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
SOUTH PORTION OF FOUNDATION PLAN "B"; S/.5 TO S/15
S TO X OK TO POUR -- ENSURE THAT MESH IS ELEVATED OFF GROUND.
10/26/2006 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
R/11 TO R/13
R/13 TO S/13
S/13 TO S/15
S/15 TO U/15
U/15 TO U/11
U/11 TO R/11
OK TO POUR
10/17/2006 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
A-E.8/3.9-14.3
10/10/2006 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
TUNNEL CAP FROM LINE B SOUTH
10/09/2006 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
TUNNEL CAP OF WHEN SP. INSP. CONFIRMS NELSON STUDS.
09/12/2006 BUILDING PRE-SLAB Partial Approval FLOATING SLAB IN TUNNEL @ A/3 AREA
06/08/2006 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*