Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T05CM05115
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2007 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* | |
05/03/2007 | BUILDING PRE-SLAB | Cancelled | ||
03/14/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* FIRST FLOOR L.8-E.N/1.0-2.0 SHEET S2.1B; OK OK REINFORCING STEEL REPORT |
|
02/20/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* NOTE: EQUIPMENT PAD ON SECOND FLOOR OK TO POUR 1. GRIDLINE FOR THIRD FLOOR K-P/1.2-15 SHEET S2.EP 2. SUPER STRUCTURE OK AREA B.1 REGARDING TO AREA K-P/1.2-15 WELD, HIGH 5-BOLTS REPORTS PROVIDED. |
|
02/09/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1. 2ND FLOOR AREA PART B-1" P.8-N/14-15 N-2.9/4-15, 4-1.5/N-L, N.8-N.1/4-1 2. SUPER STRUCTURE OK AREA B-1 PROVIDED WELD, H-S-B STEEL REPORTS |
|
01/24/2007 | BUILDING PRE-SLAB | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
01/18/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* ACTIVITY NO. T06CM01872 REBUILT FOR PARTIAL ON THIS ACTIVITY 1. 3RD FLOOR AREA "OK" B/F - 2/13.8 OK TO PLACE SLAB 2. SUPER STRUCTURE OK AREA "A" |
|
11/29/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* SOUTH PORTION OF FOUNDATION PLAN "B"; S/.5 TO S/15 S TO X OK TO POUR -- ENSURE THAT MESH IS ELEVATED OFF GROUND. |
|
10/26/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* R/11 TO R/13 R/13 TO S/13 S/13 TO S/15 S/15 TO U/15 U/15 TO U/11 U/11 TO R/11 OK TO POUR |
|
10/17/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* A-E.8/3.9-14.3 |
|
10/10/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* TUNNEL CAP FROM LINE B SOUTH |
|
10/09/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* TUNNEL CAP OF WHEN SP. INSP. CONFIRMS NELSON STUDS. |
|
09/12/2006 | BUILDING PRE-SLAB | Partial Approval | FLOATING SLAB IN TUNNEL @ A/3 AREA | |
06/08/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* |