Permit: T05CM05091

Parcel: 11931015C

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
10/02/2006 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
THE BUILDING SEWER SHALL BE TESTED BY INSERTION OF A TEST AT THE POINT OR CONNECTION WITH THE SEPTIC SEWER AND FILLING THE BUILDING SEWER WITH WATER, TESTING WITH NOT LESS THAN A 10 FOOT HEAD OF WATER AND BE ABLE TO MAINTAIN SUCH PRESSURE FOR 15 MINUTES.
- FILL ALL SEWER LINE AND VERIFY ALL SYSTEM IS COMPLETED FILL.
09/29/2006 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*