Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T05CM05044
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
04/28/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SOUTH RESTROOM OK COMPLETE SEAL OF WALL FOR BARBER SHOP RESTROOM |
|
04/24/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CAST IRON PIPING REQUIRES AN APPROVED CLOSET FLANGE THAT IS NOT PLASTIC 2. REPAIR THE LEAK ON THE MISSION COUPLING FOR LAV ON SOUTH SUITE DRAINAGE. 3. SEAL PENETRATIONS AT THIS LAVS WALL AREA FOR DRAIN TO SOUTH SUITE. FAILURE TO COMPLY WILL RESULT IN REINSPECTION FEE AT FUTURE |
|
04/22/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* NORTH RESTROOM CLOSET FLANGE OK FOR CONCRETE OR VCT. FLOOR (ONLY) SOUTH RESTROOM MAKE CORRECTIONS LISTED ON 4/17/09 INSPECTION HISTORY |
|
04/17/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* NORTH RESTROOM DWV & WATER OK 1. NEED TO SEE CORRECT CLOSET FLANGE INSTALL PRIOR TO SETTING STOOL 2. SOUTH RESTROOM REPAIR LEAK ON TRANSITION COUPLING RECALL FOR REINSPECTION 3. SOUTH RESTROOM REQUIRES CORRECT INSTALL OF CLOSET FLANGE PRIOR TO SETTING STOOL WITH INSPECTION |
|
04/16/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. POST YOUR ADDRESS! 2. NO PROVISION MADE FOR INSULATION OF WATER PIPING TO MEET I.E.C.C. 2006 3. PLAN CALLS FOR 2" TRAP AND TRAP ARM AT MOP SINK 4. SEE NOTE #5 FROM 3/13/09 |
|
03/17/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* THIS INSPECTION FOR DRAIN WASTE & VENT SYSTEM WATER TEST ONLY 1. NO REDLINES FOR WATER HEATER PIPING ON SITE, YOUR PLAN SPECS AN INSTA-HOT DEVICE, INSTALL PER APPROVED PLAN OR PROVIDE CITY APPROVED REVISION 2. YOU HAVE NOT CAPPED OPEN SANITARY SEWER PIPING, FAILURE TO COMPLETE ITEMS LISTED AS CORRECTIONS WILL RESULT IN REINSPECTION FEES AT FUTURE INSPECTIONS. 3. THE EXISTING RESTROOM IS TO REMAIN 4. PROVIDE CORRECT CLOSET FLANGE INSTALL ON FINISHED FLOORING SURFACE AT FUTURE INSPECTION. COMPLETE THAT WORK |
|
03/13/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE SUPPORT IN WALL ON ALL PIPING 2. PROVIDE TEST ON ALL PIPING 3. PROVIDE REDLINES WATER HEATER PIPING 4. LIST MAY NOT BE COMPLETE 5. CAP ALL OPEN PIPES |
|
01/29/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* PROVIDE APPROVED REVISED PLAN OF ACTUAL WORK BEING PERFORMED ON THIS SITE. THIS PLAN IS DATED 10/5/05 WITH DELETIONS DATED 8/6/07 THAT ARE NOT APPROVED |