Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2007 | FRAMING | Approved | IVRS - Inspection :* | |
| 02/02/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DBL STUD GLUE LAM BASEMENT ENTRY 2) INSTALL TPR VALVE 3) FIRESTOP CHASE 4) MAKE UP SWITCHES PIG TAIL GROUNDS 5) TUBS PLUMBED LATER 6) OK TO INSULATE |
|
| 01/25/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MANY ADDED FIXTURES BASEMENT NOT ON PLAN 2) DWV TEST AND POTABLE WATER OK 3) GROUND METAL BOXES 4) NAIL ALL HOLES HOLDOWN GARAGE 5) NAIL PROTECT COPPER WATER HEATER 6) RIASE WATER HEATER 18" GARAGE 7) PROVIDE 1" CLEARANCE ALL COMBUSTIBLES WATER HEATER FLUE 8) PROVIDE HIGH/LOW COMBUSTION RELIEF WATER HEATER 9) MISSING LIGHT GARAGE PER PLAN 10) BASEMENT WINDOW REQUIRES 44" ? TO SILL 11) DROP LAUNDRY CEILIING AND BATH BASEMENT 12) TERMINATE EXHAUST FIRST DRYER VENT TO EXTERIOR AT BASEMENT 13) MISSING FIREBLOCK LAUNDRY/NAIL PROTECT THROUGHOUT 14) STOPPED INSPECTION |
|
| 11/16/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) WILL BE DONE WITH INTERMEDIATES INSPECTION |
|
| 10/31/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE PREVIOUS INSPECTION 2) PROVIDE LEDGIBLE PLANS |