Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2006 | PLUMBING - ROUGH, SOIL | Approved | ||
| 12/13/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* FULL SIZE CLEANOUT IN BRANCH REST ROOM OK NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE POUR |
|
| 12/12/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST THRU BUILDING + HCS CONNECTION -- OK 1. PROVIDE FULL SIZE 3" CLEANOUT ON 3" STEEL BRANCH OVER 5' FROM MAIN BUILDING DRAIN PER PLAN WITH RETEST 2. NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE |