Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05CM04991
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/28/2006 | ELECTRIC - FINAL | Approved | ||
08/25/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
08/22/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. REMOVE PAINT AND TIGHTEN SPLIT BOLT FOR BONDING CONDUCTOR @ SERVICE. 2. PROVIDE PROPER ENTRY/FRONT WORKING CLEARANCE FOR AC DISCONNECT (LOWER ROOF) 3. IDENTIFY ALL RTU'S ON ROOF AS TO WHAT UNIT THEY ARE 4. TIGHTEN ALL BOND SCREWS IN RTU'S DISCONNECTS 5. LOWER ROOF GFI NOT WORKING 6. WIRING/LOADS NOT PER PLAN - PANEL ORIGINATION 7. PANEL DIRECTORY'S NOT IDENTIFIED 8. SAFE OFF EXTERIOR LIGHTING AT DRIVE THROUGH NOT INSTALLED PARTIAL INSPECTION WILL CHECK RACEWAYS/BOND CLAMP NEXT INSPECTION. |
|
08/21/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK OUTDOOR LIGHTING |
|
08/15/2006 | ELECTRIC - FINAL | Partial Approval | ||
07/12/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* CALL FOR FINAL WHEN SERVICE IS ENERGIZED. |