Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) PLAN SPECS SCHEDULE 40 PVC FOR YARD WATER PIPING 2) PEX PIPING IS OK IF ACCEPTED BY ARCHITECT 3) PROVIDE A STAMPED LETTER, AND RED LINE PRINTS 4) HCS IS OK 5) NOTIFY SW GAS TO REPAIR COATING ON GAS PIPE |
|
| 10/31/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 10/28/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/25/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*WATER TEST NORTH UNIT THRU 2 WAY CLEANOUT SEWER TURNS SOUTH RUNS APP'30 (3") OK WATER TEST SOUTH UIT THRU 2 WAY CLEANOUT INTO BUILDING OK WILL NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE WILL NEED TO VIEW CONTINUATION OF NORTH 3" SEWER THRU TIE INTO SOUTH UNIT TO HCS CONNECTION WITH TEST. |
|
| 10/24/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* PROVIDE 1/4" PER FOOT FALL ON ALL PIPING. PROVIDE WATER TEST OR AIR TEST TO 10' PROVIDE SHADEING ON ALL PIPING |
|
| 10/23/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |