Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2006 | ENGINEERING - FINAL | Approved | ||
| 03/31/2006 | ENGINEERING - FINAL | Partial Approval | TEMPOARY C OF O APPROVED COMPLETE ALL ITEMS LISTED ON PREVIOUS PUNCHLIST. |
|
| 03/24/2006 | ENGINEERING - FINAL | Denied | PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION IS APPROVED. CONTACT CRAIG GROSS 9791-5550) REGARDING POSTING A BOND FOR A TEMPORARY CEERTIFICATE OF OCCUPANCY, IN LIEU OF COMPLETION OF THE FOLLOWING PUNCHLIST ITEMS: 1. SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON DEVELOPMENT SERVICES ENGINEERING DIVISION FOR REVIEW AND APPROVAL. 2. PROVIDE REVISIONS FOR DETAILS A, B & C THAT CORRECT THE ELEVATION DISCREPANCIES (2589 PROPOSED Vs 2587 AS-BUILT). ALSO PLEASE SHOW: THE CORRECT LINEAR FEET FOR THE LOW-FLOW PIPE ON DETAIL A, SHOW THE WSEL AND SPILLWAY ELEVATIONS ON DETAIL B, SHOW THE EXISTING WALL, PROPERTY LINE AND DRAINAGE SWALE ON DETAIL C. 3. PROVIDE 12" OF REVEAL CURB ON THE RETENTION BASIN SPILLWAY AS SHOWN ON DETAIL B. MATCH THE BASIN BERM TO TOP OF CURB. 4. COMPLETE THE SITE WALL CONSTRUCTION AT THE NORTHEAST CORNER OF THE PROJECT. PROVIDE AN ENGINEERED DETAIL FOR THE WALL DRAINAGE OPENING AT THE NORTHEAST CORNER OF THE SITE. THE EXISTING WALL OPENING WAS DESTROYED DURING CONSTRUCTION. SUBMIT THE DETAIL OF THE OPENING FOR REVIEW AND APPROVAL BY THE C.O.T. ENGINEERING DIVISION. THE WALL OPENING MUST BE DESIGNED TO ACCOMMODATE THE FLOW FROM THIS SITE. 5. ADDRESS THE EXISTING SITE WALL DRAINAGE OPENING NEAR THE NORTHWEST CORNER OF THE SITE. THIS OPENING IS NOT SHOWN ON THE GRADING PLAN. STORMWATER RUN-OFF THROUGH THIS OPENING CAUSES FLOODING OF THE ADJACENT RESIDENTIAL PROPERTIES DURING HEAVY RAINFALL EVENTS. 6. PROVIDE POSITIVE DRAINAGE ON THE NORTH PERIMETER OF THE SITE. THE ROCK RIPRAP IS HIGH AND CAUSES PONDING WATER ON THE ADJACENT PROPERTY. 7. SHOW THE CORRECT TRASH ENCLOSURE DIMENSIONS ON THE REVISED PLAN. 8. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT CERTIFIES THAT THE PROJECT, DRAINAGE WAYS, AND THE RETENTION/DETENTION BASIN ARE CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLAN AND WILL FUNCTION AS DESIGNED. 9. PROVIDE BICYCLE PARKING LOCKERS AS SHOWN ON THE PLAN. |
|
| 02/21/2006 | ENGINEERING - FINAL | Denied | COMPLETE ITEMS ON PREVIOUS INSPECTION EXCEPT FOR BOLLARDS IN TRASH ENCLOSURE AND TYPE II BICYCLE PARKING WHICH HAVE ALREADY BEEN PROVIDED. 1. PROVIDE POSITIVE DRAINAGE ADJACENT TO EAST SITE WALL. 2. PROVIDE ROCK RIP RAP AT R/D BASIN INLETS AS SHOWN ON THE GRADING PLAN. 3. DEPRESS LANDCAPE IN MEDIAN 6" PER 7-14-05 REVISION. |
|
| 02/16/2006 | ENGINEERING - FINAL | Denied | 1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU03081 IS COMPLETED AND APPROVED. 2. DRAINAGE WAYS MUST BE CERTIFIED BY AN ARIZONA REGISTERED P.E. 3. COMPLETE DRAINAGE WAY AT THE NORTH PERIMETER OF THE SITE. 4. REPAIR THE DAMAGED SITE WALL AT THE NORTHEAST CORNER OF THE SITE AND PROVIDE A DETAIL FOR THE DRAINAGE OUTLET OPENING THAT HAS BEEN REVIEWED AND APPROVED BY THE C.O.T. ENGINEERING DIVISION. 5. PROVIDE (4) PIPE BOLLARDS AT SIDE WALLS TO TRASH ENCLOSURE. 6. ADDRESS THE EXISTING WALL DRAINAGE OPENING NEAR THE NORTH WESTERN SIDE OF THE SITE THAT ALLOWS DISCHARGE INTO THE ALLEY. THE WALL OPENING IS NOT IDENTIFIED/SHOWN ON THE GRADING PLAN. 7. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 8. PROVIDE BICYCLE PARKING AND LOCKERS AS SHOWN ON THE PLAN. 9. COMPLETE ALL SITE WORK. |