Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05CM04860
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/01/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* ALSO APPROVED #T05CM02678 NOTE: PARKING AREA LIGHTING NOT INSPECTED OR INCLUDED IN SCOPE OF WORK FOR THIS STRUCTURE. |
|
11/27/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. STILL HAVE OVERFILED GUTTERS -- NEC 366.6 (OVER 30 CONDUCTORS) -- CORRECT TO COMPLY WITH 310.15 B2A OR 310.15 (C) 2. NEED SIGN @ SERVICE -- NEC 700.8 3. VALET BOOTH WIRING INCOMPLETE. 4. CHECK FLEX CONNECTOR APPROVAL FOR OVER 250 V 5. RE-ENERGIZE/REMOVE TEMPORARY WIRING OK TEMP C OF O |
|
11/22/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL CORRECTIONS ON BOTH PERMITS 2) IT APPEARS WIRING IS NOT COMPLETE IN SOME AREAS 3) HAVE ELECTRICIAN ON SITE TO PROVIDE ACCESS AND OPEN EQUIPMENT AS NEEDED 4) CALL BOTH PERMITS IN WHEN READY FOR FINAL |
|
11/21/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
10/11/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. TRANSFORMER IN ROOM #1419 (TIA/N) TO CLOSE TO WALL -- NEC 110.3 2. SEAL ALL UNUSED OPENINGS IN ALL GUTTERS IN ELECTRICAL ROOMS AND DERATE CONDUCTORS IN GUTTERS AS NEEDED -- NEC 110.12A, 376.22 3. MAKE SURE ALL ENCLOSURES, GUTTERS ARE GROUNDED WITH PROPERLY SIZED EQUIPMENT GROUND -- NEC 250.148 OK TEMP C OF O CORRECTIONS, WIRING ARE ONGOING OK TO OCCUPY BUILDING FOR THE PURPOSE OF SETTING UP EQUIPMENT, STOCKING, ETC... NOTE: LOCKOUT & TAG OR DO NOT LAND ON BREAKER ANY OPEN WIRING THAT MAY BECOME ENERGIZED. CONTINUE TO COMPLETE WIRING AND CORRECTIONS AND CALL FOR FINAL WHEN ALL IS FINISHED AND ALL EQUIPMENT IS INSTALLED. |
|
10/10/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* CORRECTIONS IN PROGRESS CLOSE OFF ALL OPEN WIRING ON INTERIOR & EXTERIOR THROUGHOUT PARKING AREA LIGHTING NEEDS PLAN REVIEW, PERMIT AND INSPECTION. |
|
10/09/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* SERVICE ROOM 1. BOND ALL METALLIC PIPING TO SERVICE NEC 250.104 2. BOND ALL REMOTE G.E BARS TO BUILDING STEEL 3. INSTALL ALL PANEL DIRECTORY'S & NUMBERS MECHANICAL ROOM 1. SEAL ROOF PENETRATIONS 2. IDENTIFY ALL EQUIPMENT DISCONNECTS 3. BROKEN S.T FOR P2 4. INSTALL ALL FIXTURE BULBS 5. HAVE OPEN WIRING REAR COURTYARD -- WIRING OPEN/INCOMPLETE 1. USE APPROVED FITTING FOR FLEX WITH OVER 250V 2. EXIT SIGN TO REAR COURTYARD? |
|
10/06/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* ROOFTOP INSPECTION 1. GROUND AND IDENTIFY ALL EQUIPMENT AND DISCONNECT. 2. INSTALL PROPER OVERCURRENT PROTECTION ON EQUIPMENT PER DATA PLATES FOR CU'S & EX. FANS 2ND FLOOR INSPECTION 1. PERMANENT PANEL DIRECTORYS AND MCC/PANEL IDENTIFICATION. 2. COMPLETE RECEPTION AREAS 3. BOX EXTENDERS AS NEEDED 4. CALCULATION ON GROUNDING ELECTRODE CONDUCTOR. *NOTE: ROOMS 2211 & 2517 ARE SHELLS ONLY - NO INSPECTIONS LETTER FROM ARCHITECT CONCERNING DELETION OF LIGHTING SYSTEM RECEIVE TODAY. NEXT INSPECTION: REMAINDER OF FIRST FLOOR AND EXTERIOR/COURTYARDS PARKING LOT LIGHTING STILL NEEDS TO BE RESOLVED START MAKING PLANS TO REMOVE TEMP SITE/TRAILER WIRING. |
|
10/05/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK FIRST FLOOR EXCEPT AS NOTED (INTERIOR) ROOM # 1643 -- BOND BUSHING 250.97 LABEL DISCONNECT 1181, 1611 -- USE APPROVED FITTING WITH LB - NOT CHASE NIPPLE 1421, 1320 -- PROPERLY BOND WIRE MOLD RACEWAY LOBBY, 1200, 1300, 1400 -- FINISH RECEPTION AREA 1428 -- VERIFY LISTING OF X-RAY EQUIPMENT 1509 -- FINISH VDV'S, VERIFY LISTING FOR TUBE SYSTEM 1400, 1200 -- CHECK ELECTRIC ROOM & DATA ROOM 1181, 1508 -- APPROVED EXTENDER RINGS AT COMBUSTIBLES 1200 -- NEW VDV CABELING LAYING ON GRID 1183 -- FINISH ROOM 1154 -- FINISH CABLE TRAY 1126 -- MISSING SWITCH 1100 -- APPROVED EXTENDER RINGS IN COUNTER SPLASH 314.20 CHECK IN -- NO POWER TO ROLL-UP WINDOWS CHECK FLOOR BOXES THROUGHOUT -- CLEAN EXCESS DIRT OUT OF PANELS XL185, LIC/N, LID/N -- NEED PERMANENT CIRCUIT DIRECTORY CLEAN EXCESS DIRT OUT OF . RECEIVED CK#267 FOR $162.00 AFTER HRS. INSP. |