Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: BUILDING - FINAL
Permit Number - T05CM04826
Inspection Description - BUILDING - FINAL
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* | |
11/17/2005 | BUILDING - FINAL | Approved | IVRS - Inspection :*BUILDING MAY BE FINALED BY BOB RICH INSULATION KIT REQUIRED AT LAVATORY |
|
11/16/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :*SEE NOTES BELOW | |
10/28/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*FLOOR PLAN UNDER WATER HEATER IS INTERFERING WITH CLEAR FLOOR SPACE FOR ACCESS "THIS DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED" SIGN REQUIRED AT MAIN ENTRANCE PROVIDE PLUMBING FINAL PROVIDE ACCESSIBILITY SIGNAGE FOR RESTROOM PROVIDE LEVER HANDLE, "NO KNOWLEDGE" HARDWARE FOR RESTROOM PROVIDE 42" LONG GRAB BAR IN HORIZONTAL POSITION ON SIDE WALL 33" -36" ABOVE FLOOR. PROVIDE 18" LONG VERTICAL GRAB BAR 40" FROM REAR WALL ABOVE HORIZONTAL BAR. LAVATORY TO BE 34" MAXIMUM TO RIM ABOVE FINISHED FLOOR |