Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 12/18/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MISSING EXHAUST FANS |
|
| 11/29/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 10/25/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 10/23/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELLED |
|
| 10/22/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 09/21/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK 47 & 51 |
|
| 09/14/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK #46, 48, STOI |
|
| 09/13/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* #46 - 1. SECURE BACK WALL LIGHT 2. FINISH LAUNDRY ROOM 3. SECURE AND ATTACH GROUNDING CONDUCTOR OUTSIDE 4. INSTALL ALL STRANDS UNDER LUG AT PANEL #57 - OK #48 - 1. EXCESS PAINT ON DEVICE TERMINALS 2. INSTALL ALL STRANDS UNDER TERMINAL AT PANEL 3. BRING SIDE OF PANEL TO WITHIN 1/4" OF SURFACE |
|
| 09/10/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* FINISH ELECTRIC -- HAVE ELECTRICIAN CHECK UNIT FIRST |
|
| 08/13/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 08/10/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) OK UNITS #45 AND 60 STOI |
|
| 08/09/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/08/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/07/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* MISSING DEAD FRONTS 40, 42, 33 ATTACH 34 TO BUILDING OK UNIT #37 OK ROOFS |
|
| 08/03/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK #49 OK #55 RECEIVED CK#1214 FOR $108.00 |
|
| 08/02/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* #55 1. BOXES MORE THAN 1/4" -- 314.20 2. IDENTIFY UNGROUNDED CONDUCTOR 200.7 |
|
| 07/31/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK #58, 54, 44 |
|
| 07/30/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* #58 1. REVERSE GROUNDS & NEUTRALS OK #53 SUBJECT TO OTHERS |
|
| 07/22/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* RECEIVED CHK# 1201 FOR $432.00 ALL ROOF UNITS - CHECK UNGROUNDED CONDUCTOR IDENTIFICATION, SUPPORT OF SEAL TIGHT LOOSE FITTINGS & LABELING OF UNITS #44 - A. OUTSIDE RECEPTACLE NOT GFCI PROTECTED B. BOXES MORE THAN 1/4" FROM BOX TO SURFACE 314.20 C. LABEL PANEL AS PER 404.8 #68 A. NEED A CONNECTOR AT HOOD FOR NM CABLE B. SHEATHING TO BE 1/4" INTO HOOD COMPARTMENT C. GROUND CONDUCTOR TO BE 3/4 OF TURN UNDER SCREW D. LABEL PANEL AS PER 408.4 #54 A. BOXES MORE THAN 1/4" FROM BOX TO SURFACE B. NM CABLE TO BE 1/4" INTO HOOD COMPARTMENT C. CLEAN BUSS OF FOREIGN MATERIAL D. LABEL PANEL AS PER 408.4 E. BREAKER TO BE LISTED FOR USE BY MANUFACTURE F. SEPARATE GROUNDS & NEUTRALS #53 A. CLEAN BUSS OF FOREIGN MATERIAL B. IDENTIFY NEUTRAL CONDUCTOR C. COMPLETELY IDENTIFY UNGROUNDED CONDUCTOR ENTIRE EXPOSED LENGTH D. BOXES MORE THAN 1/4" FROM BOX TO SURFACE 314.20 E. INSTALL HOOD CONNECTOR FOR NM CABLE |
|
| 07/09/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* #44, 24 & 58 ARE OCCUPIED WITHOUT INSPECTIONS |
|
| 07/06/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. BREAKERS TO BE LISTED FOR USE BY MANUFACTURE 2. FINISH ITEMS 3 & 5 |
|
| 07/05/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL DRY WALL IN LAUNDRY ROOM 2. INSTALL OR BLANK OFF HOOD |
|
| 07/03/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* #55 1. MISSING COVER PLATES 2. GFCI FOR OUTDOOR RECEPTACLE 3. USE PROPER GROUNDING AT HOOD - NOT UNDER MOUNTING COVER SCREW 4. WE HAVE ONE TOO MANY GFI'S IN KITCHEN CIRCUITS 5. BOXES MORE THAN 1/4" FROM BOX TO SURFACE NEED APPROVED EXTENDER RING 6. PANEL LABELING TO BE AS PER 408.4 -- NO ABBREVIATIONS 7. CONDUCTORS TO BE UNDER TERMINAL SCREWS |
|
| 06/27/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELLED |
|
| 06/01/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK #56 |
|
| 05/30/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. CLEAN EXCESS PAINT FROM TERMINALS 2. CLEAN EXCESS DIRT FROM BOTTOM OF PANEL 3. TIGHTEN LOOSE CONNECTORS 4. INSTALL ALL STRANDS UNDER TERMINAL LUG 5. REMOVE OLD UNUSED DISCONNECT UNDER SERVICE AND PLUG HOLE. |
|
| 05/29/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY WARD |
|
| 05/22/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* FINAL #59 |
|
| 05/18/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. BOXES MORE THAN 1/4" FROM BOX TO SURFACE NEED APPROVED EXTENDER RINGS. 2. CLEAN EXCESS PAINT FROM BUSS & TERMINALS IN SUB-PANEL 3. INSTALL ALL STRANDS OF CONDUCTORS UNDER TERMINALS ROOF: 1. MAINTAIN WORKING CLEARANCES 2. CORRECTLY IDENTIFY UNGROUNDED CONDUCTORS 3. TIGHTEN LOOSE FITTINGS #45: 1. MISSING HOOD 2. BOXES 314.20 3. CLEAN PANEL 4. TERMINATE ALL GROUNDS #60 1. MISSING FRONT PORCH LIGHTS 2. TIGHTEN LOOSE RECEPTACLES 3. BOXES 314.20 |
|
| 08/11/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ELECTRICAL CONTRACTOR TO BE ON SITE AT ANY ELECTRICAL INSPECTION. 2. RECEPTACLES NOT PROPERLY GROUNDED 3. OK RECEPTACLE AT KITCHEN PENINSULA IS NOT GFCI PROTECTED 4. HOOD NEEDS PROPER CONNECTION 5. OK SEAL UNUSED OPENINGS IN PANEL 6. PROPERLY I.D PANEL 7. FINISH JOB 8. SHEET METAL SCREWS NOT ACCEPTABLE IN PANEL 9. PANEL HAS OVERSPRAY AT BUSSING 10. INSTALL STRAIN RELIEF AT DRYER CORD 11. GFCI REQUIRED FOR OUTDOOR RECEPT. |
|
| 08/03/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK EXISTING GUTTER & TAPS REPLACES EXISTING RISER CONDUCTORS PER PLAN |