Permit: T05CM04747

Parcel: 12801005H

Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
12/19/2005 FRAMING Approved IVRS - Inspection :*
12/13/2005 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*REFEE MUST BE PAID AT 201 N STONE
BUILD PER PLAN OR REVISE PLAN
12/07/2005 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) PROVIDE A DETAIL FOR HOW WEST WALL OF FIRE CORRIDOR WILL BE CONSTRUCTED
2) STELL STUDS USED FOR BEARING WALLS (BATHROOM) MUST BE FULLY SEATED INTO TOP AND BOTTOM TRACKS
11/30/2005 FRAMING Denied REFERENCE NOTE D2 SECTION 3.1/SP-1, HORIZONTAL BRIDGING REQUIRED 48" O.C
BALKING REQUIRED FOR GRAB BARS IN RESTROOM. REF.PP SP-3 *NOTE, YOU WILL NEED VERICAL GRAB BAR ALSO.
PLEASE NOTE THAT 1 WALL TYPE PROVISIONS HAVE NOT BEEN MET BY ??. THIS NEEDS TO BE AT TRUE 1 HOUR RATED CORRIDOR.
REF PP A-6 DETAIL 7 DRAG. STUDS TO BE 32" O.C NOT 48 DETAIL
11/29/2005 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*NO CONTRACTOR/NO LIGHTS.
I DON'T NECESSARILY NEED CONTRACTOR ON SITE BUT YOU MUST HAVE SPACE LIT UP.