Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/21/2006 | FRAMING | Partial Approval | IVRS - Inspection :* 1) PENDING ELECTRIC 2) APPROVED TO INSULATE 3) GROUND SPLICE MUST USE LISTED/APPROVED DEVICE FOR #8 COPPER |
|
| 04/18/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE LATHE 2) SEAL VAPOR BARRIER 3) FIRE STOP 2ND FLOOR PENETRATIONS 4) OVERSPAN TRUSSES IN GARAGE 5) UFER CONNECTION MUST BE IRREVERSABLE 6) POWDER REQUIRES 3" CLEAN OUT 7) STOPPED INSPECTION-NOT READY |
|
| 04/07/2006 | FRAMING | Cancelled | CANCELLED PER PAPERWORK TURNED IN BY INSPECTOR C. TREVILLYAN |