Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2006 | ENGINEERING - FINAL | Approved | ||
| 05/26/2006 | ENGINEERING - FINAL | Denied | Complete the following items and call for re-inspection 1) stabilise landscape area @ new gas meter. 2) Sweep all concrete residue from drive through area. 3) Patch asphalt cut at drive through area. 4) Remvoe construction dumpster and mobile storage unit. 5) Clean up concrete waste at entrance. |