Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2006 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 03/03/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL PER PLAN |
|
| 02/27/2006 | ROOF NAILING | Partial Approval | IVRS - Inspection :* 1) MET WITH DEVELOPER |
|
| 02/24/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999*WHAT WAS THE POINT AT DRIVING 16D NAILS INTO THE AIR ABOVE SOFFIT SPACE? WE DO ACTUALLY INSPECT. PROVIDE APPROVED CITY TRUSS PLANS |
|
| 02/22/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE APPROVED (C.O.T) SET OF TRUSS DRAWINGS 2. 2X BLOCKING PER STRUCTURAL NOTE V1.4 MISSING AT RIDGE LINE. 3. PERIMETER BLOCKING/NAILING MISSING PER ROOF NAILING SCHEDULE (YOU NEED TO TRANSFER ROOF LOAD INTO WALLS) 4. PROVIDE ACCESS ONTO ROOFTOP |