Permit: T05CM04503

Parcel: 13218171D


Addresses:

4875 S PARK AV

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
11/02/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
09/27/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. ICE MACHINE TO BE SEPARATE FULL SIZE DRAIN PER INDIRECT DRAINAGE -- CHAPTER OF 2003 UPC
2. PROVIDE SOLVENT WELD CONNECTION TO P-TRAPS
3. PROVIDE DRAINAGE FOR MACHINES ON NEW DRAINAGE PIPING WITH DIRECT CONNECTIONS.
4. PROVIDE SOLVENT WELD CAP ON 1 1/2 ABS SINK DRAIN TEST AREA.
07/18/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. HAND SINK TO BE CONNECTED TO SANITARY DRAINAGE, DIRECTLY, CORRECTLY AND PROVIDE TEST ON DRAIN PIPING.
2. PROVIDE FULL SIZE INDIRECT DRAINAGE FOR ALL EQUIPMENT, OVER 5' REQUIRES DIRECT TRAP OVER 15' TRAP & VENT.
3. ALL DIRECTLY CONNECTOR WATER TO EQUIPMENT THAT MIXES OTHER SUBSTANCES WITH WATER WITHOUT PROOF OF 1" AIR GAP REQUIRES CORRECT BACKFLOW PROTECTION WITH CERTIFICATION.
12/23/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
10/17/2005 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*WORK COVERED WITHOUT INSPECTION.
HAVE YOUR PLUMBING CONTRACTOR ON SITE FOR NEXT INSPECTION.
YOUR HANK SINK IS A DIRECT CONNECTION TO SANITARY DRAIN.
ALL INDIRECT WASTE DRAINS TO BE TRAPPED IF LONGER THAN 5' TRAPPED & VENTED IF LONGER THAN 15'.
PROVIDE ACCESS TOALL BACKFLOW DEVICE WITH CERTIFICATIONS NOT A COMPLETE LIST.
10/13/2005 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*