Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Date Description Inspector Results Comments
10/26/2005 EXT METAL CLIPS/EXT SHEATHING Approved CHECK HOLDOWNS AT INTER,
10/19/2005 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SHEARWALL STRUCTURAL PANELS MUST BE INSTALLED WITH LONG DIMENSION ACCROSS STUDS. NOTE 6 SHEAR SCHEDULE
2) HAVE ENGINEER OF RECORD EXCAVATE ALL SPAULED HOLDOWNS AND PROVIDE CITY OF TUCSON APPROVED REPAIR
3) MTT 28 B HOLDOWN MISSING ANCHOR BOLTS
4) NAIL 2 X 12 SHEAR TRANSFER TO DBL TOP PLATE AT 8" ON CENTER
5) PERMIT STATES B ELEVATION C INSTALLED
6) YOU MUST PROVIDE ACCESS TO ROOF
10/13/2005 EXT METAL CLIPS/EXT SHEATHING Denied 1) NAIL MISSED ROWS ON ROOF
2) KERF TIGHT JOINTS ON ROOF
3) MORE NAILS NEEDED IN SHEAR X-FER