Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T05CM04440
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/15/2007 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
08/17/2007 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* TRADE FINAL NOT SIGNED OFF |
|
06/21/2007 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* OK TO ISSUE TEMP C OF O AT THE DISCRETION OF THE BUILDING OFFICIAL. 1. EAST FRONT LOBBY STAIRWAY NEEDS STAIRWAY WALL AND HANDRAILS INSTALLED - IT IS TEMPORARILY BARRICADED OFF TO PUBLIC USE. 2. TRUNCATED DOMES INSTALLED AT ALL EXTERIOR RAMPS AND OTHER LOCATIONS SHALL BE PAINTED A CONTRASTING COLOR. 3. TEMP. HANDRAIL (ONE SIDE) MUST BE REPLACED WITH PERMANENT HANDRAILS ON BOTH SIDES AT NORTH LOBBY STAIRS. |
|
06/20/2007 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NEED HANDRAILS INSTALLED @ N/W STAIRWAY 2. NEED CLOSURE PANELS INSTALLED AT ALL 4 RESTROOM LAVS |
|
06/08/2007 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
04/11/2007 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* |