Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T05CM04440
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2007 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
06/19/2007 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
12/29/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) TOP OUT ON TWO N/E ENTRY "L" CMU COLUMNS |
|
12/28/2006 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) RAINED OUT SITE CLOSED |
|
12/27/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. TOP OUT OF 2 PIERS WEST OF ELEVATOR SHAFT 2. NORTH ENTRY L COLUMN TO 31'4" 3. SOUTH ENTRY L COLUMN TO 30' 4. ELEVATOR/ATM SHAFT TOP OUT 5. CONCRETE CAP AT DRIVE THRU |
|
12/21/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. DRIVE THRU EXTERIOR PIERS/CROSSOVER TO OUT TO 18'4" 2. ELEVATOR/ATM ROOM & NORTH ENTRY PIER TO 27'6" 3. SOUTH ENTRY PIER TO 24 FEET OK TO GROUT |
|
12/19/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT 1. TOP OUT GROUT (25OO PSI) CAP AT DRIVE THRU EXTERIOR PIERS. 2. TOP OUT GROUT (2500 PSI) CAP AT NORTH LOBBY CROSSOVER. 3. TOP OUT GROUT (2500 PSI) CAP AT N/E LOBBY EXTERIOR PIERS. PER RFI #21 RE: DETAILS #246 & 247 |
|
12/14/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT 1. SOUTHSIDE PIERS TOP OUT AT 24 FEET 2. SOUTHEAST CORNER COLUMN TO 22 FEET. 3. TWO SOUTHSIDE DRIVE THRU COLUMNS TO 11 FT 4 IN. 4. TWO MAIN ENTRY COLUMNS TO 22 FEET 5. ELEVATOR SHAFT/ATM ROOM & ADJ. PIERS TO 24 FT. |
|
12/13/2006 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
12/12/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. ELEVATOR, ATM ROOM & TWO ADJ. COLUMNS TO 20 FOOT 2. EAST COLUMN AT A-B TO 20 FEET 3. INTERIOR SHEAR WALL TOP OUT TO 24 FEET 4. 4FT. MID COLUMN AT S.W TO 19FT. 4 IN. 5. EAST WALL FROM B TO SECOND COLUMN TO 20 FEET |
|
12/08/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. CMU PIERS @ S/W, N/W CORNERS AND PIER @ 1.5 ON NORTH PLUS PIERS IN BETWEEN (TOTAL PIERS 6) TOP OUT TO 24 FT. 2. INTERIOR CMU SHEAR WALL 5TH LIFT TO 20FT. |
|
12/07/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. WALL 5.6 - A TO B @ 15FT HIGH 2. SECTION 4 TO 5 AT NORTHSIDE TO 16FT (ELEVATOR & ATM ROOM) 3. INTERIOR SHEAR CMU WALL AT GRID 1.7 TO 20 FT 4. SECTION 1.7 TO 2 AT SOUTH EXTERIOR WALL TO 16FT |
|
12/04/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. TOP OUT AT N/C ENTRY COLUMN CROSSOVER 2. S/E SOUTH CORNER TO GRID LINE #3 UP TO 18'8" 3. SOUTH WALL FROM GRID LINE 1.5 TO 0.9 |
|
11/30/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT 1. WEST END CMU PIERS TO 22 FOOT 2. 12" CMU INTERIOR SHEAR WALL TO 16 FOOT 3. CMU PIER NORTH SIDE AT 1.5 GRIDLINE TO 22 FOOT 4. CMU LINTEL CROSSOVER BETWEEN GRIDLINES 0.9 TO 1.3 TO 19 FOOT. |
|
11/29/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. TO CMU ENTRY COLUMNS TO 16 FEET 2. PIERS AT N/E ENTRY TO 16 FEET 3. EAST CMU WALL TO 16FEET 4. SOUTH CMU WALL FROM EAST CORNER TO THIRD PIER TO 11 FOOT. |
|
11/27/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NORTH CMU WALL FROM COLUMN LINE 1.5 TO 4 TOP OUT |
|
11/21/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. S/W CORNER TOP OUT 2. SOUTH CMU WALL FROM 11 4 TO 14 8 BETWEEN COLUMNS 1.7 TO 4.1 AND INTERIOR LEDGER CMU WALL SAME COLUMN LINES TOP OUT |
|
11/20/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TWO MAIN EXTERIOR CMU COLUMNS TO 12 FOOT NORTH SIDE LENTAL WALL TO 14FT 8 IN. FROM COLUMN LINE 4 TO 1.9 |
|
11/16/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NORTH WALL NORTH ENTRY MASONRY LENTAL & 2 COLUMNS WEST WALL TO 14 FOOT 4 INCH FROM CORNER COLUMN TO COLUMN AS PER SHEET A1.1 |
|
11/14/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 4TH LIFT FROM 11 4 TO 14 8 OK'D BY SPECIAL INSP. PHIL |
|
11/09/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SEVEN BLDG. PIERS ON SOUTHSIDE TO 11FT 4 INCH TWO DRIVE THRU PIERS ON SOUTHSIDE TO 8FT (2ND LIFT) |
|
11/07/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT @ ELEVATOR SHAFT THRU S/E CORNER (11FT 4 INCH) 2 ENTRY CANOPY COLUMNS 2ND LIFT TO 8 FOOT. |
|
11/06/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NORTHSIDE PIERS (10) THIRD LIFT TO 11 FT. 4" |
|
11/02/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) THIRD LIFT AT WEST CMU PIERS CORNER TO CORNER AND SOUTH CMU PIERS 2 ON WEST END-ELEVATE SHAFT CMU WALLS 2ND LIFT AND 40 DEGREE WALL OFF SHAFT SECOND LIFT |
|
11/01/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* MFD. BLDG SHEAR WALL 2ND LIFT - OK TO GROUT 2ND LIFT AT EAST PIERS & SOUTH FROM EAST CORNER (4 PIERS) |
|
10/30/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NORTHSIDE 2ND LIFT FROM ENTRY TO N/W CORNER. |
|
10/26/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT WEST CMU WALL & FIRST T CMU PILLARS WEST TO EAST -- OK TO GROUT. |
|
10/24/2006 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :$ PROVIDE ACCESSIBILITY 3:28 PM WORK SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES UNTIL APPROVED SEC. 109.1 IBS 2003 |
|
10/19/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT MASONRY AT BUILDING -- OK TO GROUT |
|
10/18/2006 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* RECALL FOR TOMORROW AM |
|
09/15/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* MASONRY COLUMNS TO FINISH FLOOR LEVEL OK TO GROUT |