Permit: T05CM04387

Parcel: 14020023B


Addresses:

905 E BANTAM RD #01

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
03/15/2006 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
03/03/2006 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) YOU HAVE CORRECTED THE SLOPE PROBLEM AT YOUR UPPER TERMINALS BUT YOU HAVE NOT COMPLETED THE CORRECTIONS FROM THE PREVIOUS INSPECTIONS!
2) THE BRANCH LINE TO THE S.E. BATHROOM-HAS A SECTION THAT IS FLAT
3) YOUR 3" MAIN LINE HAS A 15' SECTION THAT HAS ONLY 1 PERCENT SLOPE
4) PROVIDE UNIFORM SLOPE AT A MINIMUM OF 2 PERCENT BEFORE CALLING FOR REINSPECTION
02/27/2006 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
SEVERAL SECTIONS OF THE 3" MAIN LINE AND BRANCH LINES HAVE LESS THAN 1/4" PER FOOT.
2% SLOPE IS A MINIMUM OTHER AREAS HAVE OVER 2% PROVIDE UNIFORM SLOPE THROUGHOUT SYSTEM.
02/16/2006 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*POSSIBLE LEAK AT WEST WC BACKPITCH PRESENT AT WC