Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/03/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) YOU HAVE CORRECTED THE SLOPE PROBLEM AT YOUR UPPER TERMINALS BUT YOU HAVE NOT COMPLETED THE CORRECTIONS FROM THE PREVIOUS INSPECTIONS! 2) THE BRANCH LINE TO THE S.E. BATHROOM-HAS A SECTION THAT IS FLAT 3) YOUR 3" MAIN LINE HAS A 15' SECTION THAT HAS ONLY 1 PERCENT SLOPE 4) PROVIDE UNIFORM SLOPE AT A MINIMUM OF 2 PERCENT BEFORE CALLING FOR REINSPECTION |
|
| 02/27/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEVERAL SECTIONS OF THE 3" MAIN LINE AND BRANCH LINES HAVE LESS THAN 1/4" PER FOOT. 2% SLOPE IS A MINIMUM OTHER AREAS HAVE OVER 2% PROVIDE UNIFORM SLOPE THROUGHOUT SYSTEM. |
|
| 02/16/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*POSSIBLE LEAK AT WEST WC BACKPITCH PRESENT AT WC |