Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05CM04248
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2007 | PLUMBING - FINAL | Approved | ||
05/03/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. COMPLETE ICE MAKER INSTALL 2. VAC PUMP DRAIN IS OK TO COVER 3. MAKE CLEANOUTS WATER AND GAS TIGHT 4. CLEANOUT PLUGS SHALL BE LISTED TO RECEIVE SCREW IF USED FOR THAT PURPOSE. 5. INSTALL BACKFLOW PROTECTION AS REQUIRED BY PLAN 6. AT COFFEE EQUIPT IN RMS 52 AND 81 OR PROVIDE LETTER OF DELETION 7. PROVIDE TRAP SEAL PROTECTION FOR FD AT RM 81 OR PLUG. 8. BACKFLOW CERTS REQUIRED ON EXTERNAL ASSEMBLIES AROUND BUILDING. 9. RECEIVED CERTS ON INTERNAL ASSEMBLIES FOR ICE MAKERS AND IRRIGATION AND DOMESTIC SUPPLY ASSEMBLIES 10. RECEIVED LETTERS FROM MECH ENGINEER STATING NO NEED FOR TAPE PRIMER AT VAC PUMP. |
|
05/01/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WATER LEAK RM 168 2. CORRECT IMPROPERLY VENTED P TRAP AT VAC PUMP 3. PROVIDE METHOD OF MAINTAIN A TRAP SEAL AT VAC PUMP 4. INSTALL UNION ON 1" RPA 5. SUPPORT ALL RPA'S 6. PROVIDE BACKFLOW CERTS 7. HARD PIPE UPSTREAM OF ALL BACKFLOW ASSEMBLIES 8. INSTALL ICE MAKERS 9. PROVIDE CORRECT DRAINAGE FOR INDIRECT WASTE FROM ICE MAKERS. 1" AG REQUIRED. MED GAS COMPLETE EXP TANK OK BED PANS OK |
|
03/30/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* ADMINISTRATIVE AREA PLUMBING OK |
|
03/28/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* AT BED PAN WASHERS, NO VALVES ARE ALLOWED DOWNSTREAM OF ATMOSPHERIC VACUUM BREAKERS PER CHAPTER 6 UPC NEED PLAN REVISION FOR VAC PUMP DRAIN |