Permit: T05CM04248

Parcel: 110121020


Addresses:

2715 N WYATT DR


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T05CM04248

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
04/30/2007 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
02/07/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SCREEN WALL C/5.8 TO C/6.8 AT 8' SCREEN WALLS C.4/6.8 TO D.5/7.7 AT 48" TO 7'-8"; SCREEN WALLS F/6.7 TO J.3/7.7 48" TO 7'-8"; GENERATOR ENCLOSURE PERIMETER WALLS AT 48"
2) OK TO POUR
3) CONCRETE SPILL WAY AT N.E. CORNER AS PER DETAIL #10-C303
4) SCREEN WALL FOOTING-LINE B.4/4-6 C.2/4-6 (DONOR WALL)
5) TRASH BIN FOOTINGS-OK TO POUR
01/30/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS FOR GENERATOR PAD/FOUNDATIONS
SITE WALLS @ SE ENTRY (7'4")
01/24/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH PORCHES - OK TO POUR FOOTINGS
01/12/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SCREEN WALL F/4.3 TO F/4.6; K/4.6 TO L.5/4
OK TO POUR FOOTINGS
12/21/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
8 @ 6' LIGHT POLE CAISSONS; NW SPILL WAY - OK TO POUR
12/20/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WATER RETENTION BASIN HEAD WALL FOUNDATION --
OK TO POUR
10/31/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
APPROX. 400' OF SITE WALL @ NORTH END OF PROPERTY LINE AS PER DETAIL B/304 -- OK TO POUR
10/26/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 @ F4 FOOTINGS @ C.9/1 TO 4.9 & D.7/1 TO 4.9, 1 @ F3 @ G.2/4
10/25/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
FOUNDATION OR FOOTING UNDER WATER
FOOTING NEEDS TO BE DRY ACCORDING WITH SEC. 109 IBC
10/23/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMNS @ D.2/7, D.7/4.4; E.4/4.8, 4.4, 5.2, 5.6
OK TO POUR
10/20/2006 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/05/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 @ COLUMN FOOTINGS @ B.1/4.7 TO B.8/4.7;
6 @ COLUMN FOOTINGS @ C.9/1 TO C.9/4.9 & D.7/1 TO D.7/4.9
3 @ COLUMN FOOTINGS @ P/4.4 TO P/5.2
09/18/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F1 FOOTING AS PER 8/31/06 INSPECTION REQUEST
OK TO POUR
08/31/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F1 FOOTINGS SE QUAD -- PLEASE BLOCK OUT ELEC. ROOM SO WE CAN SEE CONDUIT.
08/29/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F1 AND F3 FOOTINGS (NO F2 MASONRY) OK FOR NE QUADRANT LINE F & LINE 5.5 AND QUAD LINES
08/25/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WEST PORTION OF BUILDING, LINES G/8 THROUGH F/4.3
OK TO POUR EXTERIOR/INTERIOR FOOTINGS.